Services & delivery

From first survey to a room-by-room rollout.

PerFitTech connects property assessment, engineering, equipment, controls, implementation, commissioning, and support in one practical modernization program for occupied hotels.

Built around the operating hotel.
GUESTS

Improve room comfort while limiting inventory disruption.

OPERATIONS

Create a serviceable system with clearer performance visibility.

OWNERSHIP

Phase capital and preserve qualifying infrastructure.

01 / Property assessment

Define the problem before defining the equipment.

We begin with the property’s existing conditions, operating priorities, guest-comfort issues, and capital timing. The goal is to establish whether room-by-room modernization is a credible path and what must be verified next.

Request a property assessment
INPUTS

Existing-condition review

Room types, fan coils, piping, water conditions, electrical capacity, controls, condensate, drawings, photos, and operating history.

PRIORITIES

Business & operating goals

Guest complaints, room availability, renovation or PIP timing, capital windows, energy objectives, and service concerns.

OUTPUT

Qualification roadmap

A clear view of promising conditions, open technical questions, property risks, and the information needed to advance.

NEXT STEP

Project path

Recommended survey, engineering, pilot, controls, phasing, and budget-development activities appropriate to the property.

03 / Connected controls

Connect the room, the equipment, and the people who support it.

PerFitTech develops the controls strategy around the selected equipment and hotel priorities, with interfaces and points confirmed for the project—not assumed.

ROOM INPUTSThermostat & sensorsSetpoint, occupancy, door or window status, and room mode.
LOCAL CONTROLRoom equipmentFan, valve, compressor, safeties, and operating sequence.
HOTEL VISIBILITYSupervisory layerStatus, alarms, trends, commands, and remote diagnostics.
Project-specific integration: PMS, BMS, BACnet, Modbus, gateway mappings, alarm routing, trend retention, and remote permissions depend on the selected controller and system package.
Ways to work together

Lead the program or strengthen the project team.

PerFitTech can serve as the turnkey modernization lead or work alongside the owner’s consulting engineer, architect, controls contractor, installation trades, and hotel operations team.

TURNKEY LEAD

One coordinated modernization program.

Useful when ownership wants a clear line of accountability across assessment, engineering, equipment, controls, implementation, and support.

  • Integrated scope and phasing
  • Coordinated project handoffs
  • Commissioning and closeout continuity
  • Post-installation support path
PROJECT PARTNER

Specialized expertise inside the existing team.

Useful when the property already has design and construction partners but needs PMAC/PAFMAC application support and a room-by-room delivery framework.

  • Basis-of-design collaboration
  • Product and controls coordination
  • Pilot-room planning
  • Rollout and commissioning support